0.2(top 100%)
impact factor
1.3K(top 20%)
papers
3.2K(top 20%)
citations
20(top 50%)
h-index
0.2(top 100%)
extended IF
1.3K
all documents
3.4K
doc citations
30(top 50%)
g-index

Top Articles

#TitleJournalYearCitations
1Optimal reliability, production lot size and safety stock in an imperfect production systemInternational Journal of Mathematics in Operational Research201091
2A dual simplex method for bounded linear programmes with fuzzy numbersInternational Journal of Mathematics in Operational Research201043
3Two echelon supply chain model for deteriorating items with effective investment in preservation technologyInternational Journal of Mathematics in Operational Research201442
4An extension of the linear programming method with fuzzy parametersInternational Journal of Mathematics in Operational Research201141
5A finite replenishment model with increasing demand under inflationInternational Journal of Mathematics in Operational Research201040
6Balking and reneging in multiserver Markovian queuing systemInternational Journal of Mathematics in Operational Research201137
7Supply chain model for deteriorating items with stock-dependent consumption rate and shortages under inflation and permissible delay in paymentInternational Journal of Mathematics in Operational Research201036
8Optimal material distribution decisions based on epidemic diffusion rule and stochastic latent period for emergency rescueInternational Journal of Mathematics in Operational Research200935
9Solving the disassembly-to-order problem using linear physical programmingInternational Journal of Mathematics in Operational Research200935
10An integrated production inventory model for perishable products with trade credit period and investment in preservation technologyInternational Journal of Mathematics in Operational Research201633
11Optimal control of (N, F) policy for unreliable server queue with multi-optional phase repair and start-upInternational Journal of Mathematics in Operational Research201232
12A stochastic programming approach for sawmill production planningInternational Journal of Mathematics in Operational Research201329
13Load sharing M-out of-N: G system with non-identical components subject to common cause failureInternational Journal of Mathematics in Operational Research201228
14Fuzzy EOQ models with ramp type demand rate, partial backlogging and time dependent deterioration rateInternational Journal of Mathematics in Operational Research201227
15Availability analysis for repairable system with warm standby, switching failure and reboot delayInternational Journal of Mathematics in Operational Research201327
16An EOQ model for perishable item with stock and price dependent demand rateInternational Journal of Mathematics in Operational Research201026
17Trapezoidal intuitionistic fuzzy number with some arithmetic operations and its application on reliability evaluationInternational Journal of Mathematics in Operational Research201326
18A partial backlogging inventory model for deteriorating items with time-varying demand and holding costInternational Journal of Mathematics in Operational Research201526
19Notes on triangular intuitionistic fuzzy numbersInternational Journal of Mathematics in Operational Research201325
20Fuzzy methodology application for failure analysis of transmission systemInternational Journal of Mathematics in Operational Research201823
21Analysis of a batch arrival general bulk service queueing system with variant threshold policy for secondary jobsInternational Journal of Mathematics in Operational Research201121
22Algorithms for solving fuzzy transportation problemInternational Journal of Mathematics in Operational Research201821
23Multi-release software reliability growth assessment: an approach incorporating fault reduction factor and imperfect debuggingInternational Journal of Mathematics in Operational Research201921
24A fuzzy multi-item production model with reliability and flexibility under limited storage capacity with deterioration via geometric programmingInternational Journal of Mathematics in Operational Research201120
25Unreliable server M/G/1 queue with multi-optional services and multi-optional vacationsInternational Journal of Mathematics in Operational Research201320
26Hybrid bat algorithm for flow shop scheduling problemsInternational Journal of Mathematics in Operational Research201620
27Queueing systems with vacation: an overviewInternational Journal of Mathematics in Operational Research201620
28A vendor-buyer supply chain model for time-dependent deteriorating item with preservation technology investmentInternational Journal of Mathematics in Operational Research201720
29An inventory model for deteriorating items with preservation facility of ramp type demand and trade creditInternational Journal of Mathematics in Operational Research202020
30Systemability function to optimisation reliability in random environmentInternational Journal of Mathematics in Operational Research200919
31Queueing model with state-dependent bulk arrival and second optional serviceInternational Journal of Mathematics in Operational Research201119
32Renewal input infinite buffer batch service queue with single exponential working vacation and accessibility to batchesInternational Journal of Mathematics in Operational Research201119
33A fuzzy goal programming technique for multi-objective chance constrained programming with normally distributed fuzzy random variables and fuzzy numbersInternational Journal of Mathematics in Operational Research201319
34Transient analysis of an M/M/1 queue with a repairable server and multiple vacationsInternational Journal of Mathematics in Operational Research201419
35Searching for a d-dimensional Brownian target with multiple sensorsInternational Journal of Mathematics in Operational Research201619
36An imperfect fuzzy production-inventory model over a finite time horizon under the effect of learningInternational Journal of Mathematics in Operational Research200918
37Optimal production rate and production stopping time for perishable seasonal products with ramp-type time-dependent demandInternational Journal of Mathematics in Operational Research201018
38A linear Goal Programming approach to multiobjective fractional programming with interval parameter setsInternational Journal of Mathematics in Operational Research201118
39A procedure-based heuristic for 0-1 Multiple Knapsack ProblemsInternational Journal of Mathematics in Operational Research201218
40Analysis of finite-buffer bulk-arrival bulk-service queue with variable service capacity and batch-size-dependent service: M<SUP align="right">X</SUP>/G<span style="position:relative; top:-5px;left:0px;">Y</span><span style="position:relative;top:2px;left:-5px;margin-left:0px;margin-bottom:10px;">r</span>/1/NInternational Journal of Mathematics in Operational Research201318
41Optimal policies for vendor-buyer inventory system involving defective items with variable lead time and service level constraintInternational Journal of Mathematics in Operational Research201418
42Integrated vendor-buyer model with defective items, inspection error and stochastic demandInternational Journal of Mathematics in Operational Research201618
43Robust and stable flexible job shop scheduling with random machine breakdowns: multi-objectives genetic algorithm approachInternational Journal of Mathematics in Operational Research201918
44An integrated cost model for production scheduling and perfect maintenanceInternational Journal of Mathematics in Operational Research201117
45Imperfect debugging study of SRGM with fault reduction factor and multiple change pointInternational Journal of Mathematics in Operational Research201417
46Matrix games in intuitionistic fuzzy environmentInternational Journal of Mathematics in Operational Research201316
47Analysis of M<SUP align="right">[X]</SUP>/G/1 retrial queue with two phase service under Bernoulli vacation schedule and random breakdownInternational Journal of Mathematics in Operational Research201516
48M-states search problem for a lost target with multiple sensorsInternational Journal of Mathematics in Operational Research201716
49Ant colony-based algorithms for scheduling parallel batch processors with incompatible job familiesInternational Journal of Mathematics in Operational Research201015
50X/Geo/1 queue with working vacation">Maximum Entropy Approach for discrete-time unreliable server GeoX/Geo/1 queue with working vacationInternational Journal of Mathematics in Operational Research201215