Type: Article
Journal: Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
Year: 2018
Pages: 232, 534-545
Minimizing Makespan and Total Flow Time in Permutation Flow Shop Scheduling Problems Using Modified Gravitational Emulation Local Search Algorithm
Distribution of the number of citations over years.

Authors

#AuthorsArticlesCitationsh-index
1R Sanjeev Kumar111516

Cited by 16 articles from 40 authors, 27 universities and 13 countries.