Prioritization of hydroelectric power plant earth dam safety procedures: a multi-criteria approach

  • Original Article
  • Published:
Environmental Earth Sciences Aims and scope Submit manuscript

Abstract

The number of procedures focused on dam safety is very large, mainly due to the rules established by different regulatory bodies, the guidelines that are part of the recommended best practices for engineering works, and the common sense and conservatism present in dam operation and maintenance because of the large socioeconomic and environmental impacts that any incident with a dam can cause. In practice, the vulnerability of a dam is inversely proportional to the improvement of safety procedures, such as monitoring and sensing, and the staff’s capacity to interpret the information in timely fashion. Therefore, establishing priorities for these procedures is essential for the plant management to define the scheduling and detailing of inspections and monitoring, as well as training needs. The MCDA model described here was specified based on regulations and practical public domain guidelines. The subjective estimation of preferences was done by the staff of a hydroelectric plant located in central Brazil. It employed the Simos method combined with a procedure adopted to convert the scores to the format of paired comparisons. The weights for dam safety procedures were obtained using the fuzzy AHP method. The method allowed obtaining the classification of safety procedures according to their priorities, and thus provided the plant management with elements to better schedule monitoring and staff training.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2

Similar content being viewed by others

Data availability

R codes are available in Supplementary Information.

Code availability

Not applicable.

References

Download references

Funding

The field research received financial support from Corumbá Concessões S/A and Agência Nacional de Energia Elétrica under the R&D Project PD-02262-0017/2019.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to José Roberto Ribas.

Ethics declarations

Conflict of interest

Not applicable.

Ethical approval

Not applicable.

Research involving human participants and/or animals

Not applicable.

Consent to participate

Not applicable.

Consent for publication

Not applicable.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ribas, J.R., Severo, J.C.R., Felix, L.C.G. et al. Prioritization of hydroelectric power plant earth dam safety procedures: a multi-criteria approach. Environ Earth Sci 80, 815 (2021). https://doi.org/10.1007/s12665-021-10096-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s12665-021-10096-9

Keywords

Navigation